Executive Summary
This report benchmarks directional drilling performance across two of the Americas' highest-volume basins: the Permian Basin (West Texas/New Mexico) and the Llanos Basin (Colombia). Data is drawn from operations tracked through the Netora Drilling Intelligence platform.
Key findings:
- Average NPT in the Permian stands at 7.2% of total rig hours; in the Llanos, 11.4%
- BHA failure is the #1 NPT cause in both basins
- AI-assisted parameter optimization reduces NPT by an average of 34% in tracked operations
- Cost-per-foot in the Llanos is 22% higher than comparable Permian wells, driven primarily by logistics and stuck-pipe events
NPT Breakdown by Category
Permian Basin (Tracked: 847 wells, 2024–2025)
| NPT Category | % of Total NPT Hours |
|---|---|
| BHA Failure / Washout | 31.4% |
| Stuck Pipe | 22.7% |
| Lost Circulation | 18.3% |
| Surface Equipment | 14.2% |
| Wellbore Instability | 9.1% |
| Other | 4.3% |
Average NPT per well: 18.4 hours Average NPT cost per well: $142,000
Llanos Basin, Colombia (Tracked: 214 wells, 2024–2025)
| NPT Category | % of Total NPT Hours |
|---|---|
| BHA Failure / Washout | 28.9% |
| Stuck Pipe | 29.3% |
| Lost Circulation | 21.7% |
| Logistics / Mobilization | 12.4% |
| Wellbore Instability | 6.1% |
| Other | 1.6% |
Average NPT per well: 31.7 hours Average NPT cost per well: $218,000
ROP Performance
Permian Basin
- Average ROP (vertical section): 187 ft/hr
- Average ROP (curve section): 112 ft/hr
- Average ROP (lateral section): 94 ft/hr
Llanos Basin
- Average ROP (vertical section): 143 ft/hr
- Average ROP (curve section): 89 ft/hr
- Average ROP (lateral section): N/A (predominantly vertical and deviated wells)
AI Optimization Impact
Wells drilled with AI parameter recommendations from Netora Drilling Intelligence showed the following vs. offset wells in the same basin:
| Metric | Permian AI-Assisted | Permian Offset | Llanos AI-Assisted | Llanos Offset |
|---|---|---|---|---|
| NPT (% of rig hours) | 4.7% | 7.2% | 7.4% | 11.4% |
| Avg ROP lateral (ft/hr) | 108 | 94 | — | — |
| BHA runs per well | 1.8 | 2.4 | 2.1 | 3.1 |
| Cost vs. AFE | -4.2% | +1.8% | -6.1% | +3.4% |
Key Takeaways
-
BHA selection is the highest-leverage intervention. In both basins, AI-assisted BHA selection from analog databases reduces failure rates and extends run life.
-
Stuck pipe in the Llanos is under-managed. With 29.3% of NPT hours attributed to stuck pipe vs. 22.7% in the Permian, there is significant headroom for predictive stuck-pipe intervention in Colombian operations.
-
Real-time parameter optimization is not optional. The cost-per-foot delta between AI-assisted and non-assisted wells is $8.40/ft in the Permian and $14.20/ft in the Llanos — at 12,000 ft per well, that is $100,800–$170,400 per well in recovered cost.
Netora Drilling Intelligence is built by a team with experience tracking well performance across 120+ active rigs. Contact your Netora specialist for a basin-specific benchmarking analysis of your operations.
Related: Netora Drilling Intelligence → | Contact a Specialist →
